Patent App
Available in 2m lengths as standard
Available as either a smooth profile to encourage the flow of water or a ribbed profile to slow the flow of water.
Ribbed and Smooth sections can be combined in any configuration to suit the specific site requirements
Easily perforated on-site, if required
Supplied complete with a weed suppressant Geotextile, if required to prevent growth of vegetation through perforations
Sections are simply placed into position and adjacent sections connected together using the supplied self tapping screws
Sections are secured into place using 12mm Ø, 1,000mm long GRP stakes supplied complete with locking clamps
‘Y’ Junctions, ’T’ pieces and bends available on request
Amalgamated Construction requested a site visit from an Aqua representative to investigate the options available to extend an existing culvert to repair a collapsed embankment. ...
Construction and design challenges have provided the catalyst for yet more innovative construction at Clay Mills. Installing Pre-fabricated HDPE manholes is a major step forward for the UK water indus...
The will be £40m investment into modernising the Tyne and Wear Metro system, this project will happen over the next 12 months. ...
The site of the drainage was a tight 6ft with the catch-pit touching the cut-back sleeper. Originally the catch-pits consisted of concrete base and frames. ...
Severity: Warning
Message: Illegal string offset 'text'
Filename: standard/product.php
Line Number: 160